![The Location of The Installation](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/478323-img_20190729_083851117.jpg?v=1691172583)
The Location of The Installation
Here, you can see a wet spot due to all the water coming from the floor! It wasn't hard to find a spot for the install.
![Jackhammered](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/478324-img_20190729_092540733.jpg?v=1691172583)
Jackhammered
The production crew jackhammered a trench that runs perpendicular to the existing perimeter drainage system.
![Concrete and Inspection Port](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/478325-img_20190729_101158213.jpg?v=1691172583)
Concrete and Inspection Port
We poured fresh concrete over the artery line and inserted an inspection port to give access to clean the trench out.