Jackhammering To Make Sump Pit
The production crew started off by jackhammering a sump pit to the perfect size for the TripleSafe sump pump to live in.
Placing In The Product
The crew placed in the TripleSafe into the pit. Then they connected the pipes to the discharge line along with the primary pump, secondary pump and backup electrical pump incase of power outages.
The TripleSafe Sump Pump Installed
After plugging in the system, they covered the rest of the pit with concrete to finish the job!