
The Location of The Installation
Here, you can see a wet spot due to all the water coming from the floor! It wasn't hard to find a spot for the install.

Jackhammered
The production crew jackhammered a trench that runs perpendicular to the existing perimeter drainage system.

Concrete and Inspection Port
We poured fresh concrete over the artery line and inserted an inspection port to give access to clean the trench out.